December 2017 / January 2018

December 2017 / January 2018

Site report December 2017 / January 2018:At the end of December, 80 concrete mixer trucks were working on site – up to 15 concrete mixers at the same time. Two large concrete pumps brought a total of 550 cubic meters of concrete to the ceiling and beam formwork. Construction is continuing in big steps and the next floor is slowly taking shape.