The shell work is running on schedule. In April the ceiling was concreted over the 3rd floor. The building services have begun their work. The first window deliveries are expected by the end of May.

May 7, 2018 By G40

Site report December 2017 / January 2018:At the end of December, 80 concrete mixer trucks were working on site – up to 15 concrete mixers at the same time. Two large concrete pumps brought a total of 550 cubic meters of concrete to the ceiling and beam formwork. Construction is continuing in big steps and the next floor is slowly taking shape.